The previous picture is to the immediate right of this one.
This is the worst part of the hallway molding.
The addition of this flexible molding makes the transition to the 1/4" sheetrock look natural.
Here the sheetrock is added and some of the plaster work has been started.
As each coat goes on around the entire hallway things shape up dailly.
The right side. This is the chimney wall.
There is a lot more to follow. I just realized I didn't finish this page. 3/20/07 and just coming back to this page I realize I still have to upload the pictures. 4/4/07